首页 / 产品中心 / 控制模块
  • CNC Milling Controller:
 1) Support Dual analog voltage(0~10V)& C-axis for Spindle servo
 2) Support RTCP mode
 3) Support Stepper/Increment/Absolute/EtherCAT/Powerlink Servo for Feeding Axes
 4) Scanning Function & Follow Mode & Auto Tool Setter/Probe
  • Controller Cnc Milling For 5 Axis

    CNC Milling Controller: 1) Support Dual analog voltage(0~10V)& C-axis for Spindle servo 2) Support RTCP mode 3) Support Stepper/Increment/Absolute/EtherCAT/Powerlink Servo for Feeding Axes 4) Scanning Function & Follow Mode & Auto Tool Setter/Probe

参数与性能


                       


_20220707145050

Number of control axes5 axes 
Minimum programming0.001mm
Maximum programming± 99999.999mm
Top speed30m / min
Feed speed0.001-15m / min
Manual continuousOne axis or simultaneous multi-axis
Screen saver functionScreen saver function
Program editingMale / English, relative / absolute programming
Pre-reading functionShort line preprocessing 10,000 lines
Compensation functionKnife compensation, between compensation, screw compensation, radius compensation
Communication functionRS232, U disk interface
Program editingMale / English, relative / absolute programming

Tool functions:

1)Tool length compensation
2)Tool point radius compensation (C type)

Program operation

Create, edit, delete, rename, search, copy, copy, paste, read in, out, background editing, dynamic graphics simulation

High-speed and high-precision machiningG05 high-speed small line segment look-ahead, trajectory smoothing processing, look-ahead and pre-reading up to 1000 segments


1.-&(1000MC)(1)


3.-(1000MC)

4.-&(1000MC)

GH-1000TC

Multiple function:

It can realize the drilling/boring,roughing of roungroove / rectanglegroove ,finishing of full circle /rectangle, continous drilling of straight line /rectangle /arc etc.


7.-()

8.-&&()


FAQ

Q1. Can I have a sample order for test?

A: Yes, we welcome sample order to test and check quality. We will provide the technical support. but if you does not have any basic knowledge,we do not suggest.


Q2. What about the lead time?

A: Sample needs 3-5 days, mass production time needs 1-2 weeks for order quantity.


Q3. How to proceed an order for our controller?

A: Firstly after you check our controller datasheet or you are familiar with the Mach3 controller,you can directly tell us how many axis you need or you can let us know your requirements or application and how many axis you need.
Secondly We quote according to your requirements or our suggestions.
Thirdly customer confirms and send the payment to us.
Fourthly We arrange the delivery.


If you have any questions, pls feel free to contact us. We'll be sure to get back to you within an hour on a business day.

相关行业应用案例
联系我们
如果您有业务洽谈上的需要,请随时与我们联系
0755-2774 5002
136 3151 5268
zoupinde@robogood.cn
深圳市龙华区大浪街道新石社区华宁路117号中安科技园A栋902